Government of India
Ministry of Railways
(Railway Board)
No.2018/Transf. Cell/MR Dash Board/Motivation Dated: 09.07.2018.
The General Manager, All Indian Railways/PUs, NF(Con), CORE
The DG/RDSO/Lucknow, DG/NAIR /Vadodara
CAOs, DMW/Patiala, WPO/Patna, COFMOW/NDLS, RWP/Bela, CAO/IROAF
Sub: Incentive Scheme for Railway Employees.
Ref: (i) This office letter of even No. dated 27.12.2017
(ii) Presentation made to the Board on 06.03.2018
(iii) This office letter of even No. dated 23.03.2018
Pursuant to the presentation made by the GM/NWR to full Board on 06.03.2018, recommendations of the Committee have been considered by the Board (ME, MT, MS, FC, CRB). Following key recommendations have been
approved by CRB.
1. At the time of exercising option for fixation of pay the employee shall be provided with two options for calculation of pay so that he is able to pick up the best. As the employee would be exercising the option in a more informed
manner, a wider window be provided to them, if they seek to change the option, and Master Circular for the pay fixation should be suitably amended.
2. Zonal Railways can consider providing accommodation (not leased) strictly for family of field level staff at a nodal station generally within 50-100 kms of the way side station where he or she is posted. The Zonal Railway may chose the nodal station on their own where they want to operate this scheme as per feasibility and allot vacant quarters at the nodal stations on the first come fist serve basis. If required some of the way side station quarters can be converted into transit camp or dormitories at the discretions of Zonal Railways.
This would alleviate a major concern of our field staff who face problems on this account. GM’s may take necessary action based on the above.
3. It would be better to provide resting facility with toilets at manned level crossings for use by the trackmen and other field staff. This facility can be a temporary structure made up of porta cabins and be provided within the
sanctioned budget of the Zonal Railways.
4. All other items which are apparently of general nature may be taken up as a pilot project by GM/NWR for which he is being fully authorized. The result of the pilot project be sent to Board for further action.
Concerned Directorates will issue necessary detailed instructions in respect of items at 1,2 & 3 above in particular and other items listed in the Annexure wherever necessary.
This issues with the concurrence of Associate Finance of Transformation Cell.
No.2018/Transf. Ceii/MR Dash Board/Motivation
1. PFAs, All Indian Railways & Production Units
2. The ADA! (Railways), New Delhi
3. The Director of Audit, All Indian Railways
Copy- As per list enclosed
(A.K.Chandra)
Executive Director
Transformation
Dated: 09.07.2018.
PDF file has been reproduced underneath:-